Product Parameters
Parameters of Railway Mine Rail Steel Turnout For Railway Tracks Railroad Turnout Rail Track Sleepers Switch Parts And Accessories
Model |
Gauge(millimeter) |
Flog number |
Curve radiue(m) |
Total weight(kg) |
612-2-3 |
600 |
No.2 |
34000 |
311 |
612-3-6 |
No.3 |
66100 |
515 |
612-4-12 |
No.3 |
126800 |
573 |
612-5-15 |
No.5 |
157400 |
|
615B-2-3 |
No.2 |
34000 |
|
615B-3-6 |
No.3 |
66100 |
|
615B-4-12 |
No.4 |
126800 |
|
615B-5-15 |
|
No.5 |
157400 |
|
Product Description
RAILROAD SWITCH
PRODUCT INTRODUCTION
An important connecting device for a line
Turnout is a kind of line connecting equipment that trensfers the locomotive and vehicle from one channel to another channel.it is usually laid in a large numberof stations and marshalling yards,with the turnout,can give full play to the line through the ability.
Even on a single-track railway,trains can be split by building a turnout,by building a fork that is longer than the length of the train.
RAILROAD SWITCH
THE WORKING PRINCIPLE OF
A switch that switches a train from one set of taacks to another.
Each set if turnout is composed of a switch,a tuenout center,two guard rails and a turnout pillow.two moving rails are pulled by a long handle on the orinciple of lever to make the vehicle rim enter the predetermined approach road according to the opening direction.
A switch that switches a train from one set of tracks to another
The double crossing turnout looks like an X - shaped turnout, which is actually a combination of four single switches and a pair of diamond crossings. The X - shaped doublecrossing bifurcation above and below the two points are connected respectively, is thecross - crossing line.lt can not only open more directions, and occupy less space, sooften used in the station.
There is also a cross device,usually called a diamond cross,it consists of two sets of acute frog and two sets of obtuse frog,but there is no switch,so no line can be changer between tracks.
RAILROAD SWITCH
THE USE OF TURNOUT
Turnout a wide range of USES, the common coal transport,metallurgy industry, railway, such as car brake.
FAQ
Can you do the ODM or OEM, what is MOQ?
Yes, it is possible as both discussed, MOQ: 1unit.
What about delivery time, how long can I get the machine since order.
The producing time fast to 15-20 workings if you will customerized machine.
The standard machine in stock, can delivery as soon as possible after ordering.
How to pay for you ?
30% down payment, then producing start, the balance 70% paid before shipping.
If the machines in stock, pay 100% then delivery.